Electricity · Industrial electricity

Transformer kVA, current and load sizing

Relate transformer apparent power, voltage and current in single-phase or three-phase systems, or estimate required kVA from active load, power factor and a sizing margin.

Created v1.0

By Thibaut Grzelak, Mechanical Analysis Engineer

Industrial electricity
01Calculation inputsS = k · U · I
3φUISPcos φ · mS ↔ I
Relate transformer apparent power, voltage and current in single-phase or three-phase systems, or estimate required kVA from active load, power factor and a sizing margin.
%
02

Results

Line current I
—

RMS current corresponding to the apparent power and voltage entered.

Relation and numerical substitutionS = k · U · I ; I = S / (k · U) ; Sreq = P · (1 + m) / cosφ

—

U is the RMS circuit voltage; for three-phase calculations it is the line-to-line voltage. Sizing modes use electrical active load power and assume a constant power factor. Margin m increases the calculated apparent-power requirement; no standard transformer rating is selected automatically. Losses, efficiency, harmonics, inrush, impedance, internal voltage drop, temperature rise, protection and code coordination are not checked.

01Formulas and symbols

Formulas used

k1 (1φ) ; √3 (3φ)Phase factor used in the power relation
IS / (k · U)Current from apparent power and voltage
Sk · U · IApparent power from voltage and current
SreqP · (1 + m) / cosφMinimum apparent power from active load, power factor and margin
02Assumptions and limits

Scope of validity

  • U is the RMS circuit voltage; for three-phase calculations it is the line-to-line voltage.
  • Sizing modes use electrical active load power and assume a constant power factor.
  • Margin m increases the calculated apparent-power requirement; no standard transformer rating is selected automatically.
  • Losses, efficiency, harmonics, inrush, impedance, internal voltage drop, temperature rise, protection and code coordination are not checked.
03Validation example

Reference numerical case

  1. 3φ · P = 75 kW · cosφ = 0.90 · m = 20 % · U = 400 V
  2. Sload = 75 / 0.90 = 83.333 kVA
  3. Sreq = 83.333 × 1.20 = 100.000 kVA
  4. I = 100000 / (√3 × 400) ≈ 144.34 A
04References

Technical references

  1. IEC 60076-1 — Power transformers — Part 1: General.

FAQ

Which voltage should I enter?

For single phase, enter the circuit voltage. For three phase, enter RMS line-to-line voltage.

What does the sizing margin do?

It increases the calculated apparent-power requirement to reserve capacity above the entered active load.

Does the calculator choose a standard transformer rating?

No. It calculates a kVA requirement; selection of a catalogue rating remains a project and manufacturer decision.

Are losses and inrush current included?

No. Transformer losses, inrush, protection and short-circuit duties are outside this calculation.